Skip to main content

V1.1

by Yu Feng Kao

  1. Turn the purple button clockwise to open the pump pipe box There is a section of the salt water pipeline that is used exclusively for pumping water and has a larger diameter. There are two raised rubber rings on both sides
    • Turn the purple button clockwise to open the pump pipe box

    • There is a section of the salt water pipeline that is used exclusively for pumping water and has a larger diameter.

    • There are two raised rubber rings on both sides

    • After tightening the water pipe slightly, clamp the raised rubber rings on both ends of the pump pipe box.

    • Turn the purple knob counterclockwise to close the pump pipe box, making sure that the pipe is not caught and cannot be closed.

  2. After tightening, try to step on the pedal to determine whether water can come out.
    • After tightening, try to step on the pedal to determine whether water can come out.

    • If you have closed the tube after the test to avoid saline dripping, remember to open it again before surgery.

Finish Line

Ya Fen Huang

Member since: 02/19/2015

78 Guides authored

Team

臨床操作守則 Member of 臨床操作守則

0 Members

0 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 39